Train and metro wash systems built to the depot

Wash systems for metro trains, light rail and rail vehicles are built to order by Europe Makine. The specification follows the trainset profile, the depot road and the cycle time available per set.

Talk to Europe Makine

Sheet
03 / 04
Subject
Train wash
Supplier
europemakine.com
Blue wash gantry with upright brushes standing over a long, empty wash lane inside a hall, yellow guide rails on the floor

Specified on cycle time per set

A rail wash is specified on two figures: the cycle time per set and the length of depot road the wash occupies. Both are set against the turnaround window the depot works to.

Cab ends, roof equipment, door recesses and inter-car gaps are treated on the same pass. The brush and nozzle layout is drawn to the vehicle profile.

Drawn to the running line

Each system fits the existing running line, so the geometry of the track, the structure gauge, clearances and electrification all feed the drawing. Construction is modular, and it is built in Europe Makine's own facility.

Washing is by contact or by high pressure without contact, chosen per project against the livery and finish of the fleet. PLC computer control runs automatic programs with a manual override, for attended or unattended operation.

Built in Europe Makine's own facility

Europe Makine brings more than 30 years in the production, sale and after-sales service of automatic wash machines. Its in-house R&D designs custom automatic washing systems to customer demand, and rail systems are drawn that way, from the operator's rolling stock and depot.

The same company builds SUNRISE gantries for buses, coaches and trucks, so an operator running road and rail fleets can specify both classes with one supplier. Every machine in the range runs under PLC control.

Rail wash specification

Set length Specified per project
Cycle time per set Specified per project
Wash envelope Specified per project
Brush or brushless Specified per project
Water recovery Specified per project
Control system Specified per project

Source: europemakine.com/systems/train-and-metro-wash-systems/

Water reclaim loop Used wash water drains from the bay floor into a collection pit, passes through settling tanks where solids drop out, then through filtration into a reclaim storage tank. A pump returns reclaimed water to the wash stages. Fresh water tops up the storage tank, and settled sludge is removed from the settling tanks. Wash bay floor drain settled sludge removed Reclaim storage fresh water top-up pump Reclaimed water back to the wash stages 1 Collection 2 Settling 3 Filtration 4 Reuse loop
Fig. 1 Water recovery and recycling, specified against the volume per set and the site discharge consent.

Water recovery from the start

Water recovery and recycling are specified into a rail wash from the first drawing. The system is sized against the volume used per set and the site's discharge consent.

What a rail wash quotation starts from

  1. Rolling stock

    Which stock runs there, how long each set is and how many sets there are.

  2. Depot road

    How much road is available, with its clearances and electrification.

  3. Wash frequency

    How often each set is washed and the turnaround window.

  4. Operation

    Whether the wash is attended or unattended.

  5. Water

    Supply water, discharge consent and whether recycling is required.

Questions and answers

Does Europe Makine build wash systems for trams?
Yes. The rail range covers metro trains, light rail and rail vehicles, each engineered to order.
Can a train wash run unattended?
Yes. PLC control supports attended or unattended operation, with automatic programs and a manual override.
Is the wash brush or brushless?
Either. Contact or high-pressure contactless washing is specified per project against the livery and finish.
What drawings does Europe Makine need?
The depot drawing and the set profile. The quotation is built from those.
How is water recovery sized for a rail wash?
Against the volume of water used per set and the site's discharge consent. Recovery and recycling are specified in from the start.

Send the depot drawing

A rail wash is quoted from the depot drawing and the set profile.

Talk to Europe Makine europemakine.com/contact/